IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,950

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0286 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $2,353 $1,315 Not Implemented
TN0286 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,478 $0 Implemented
TN0286 # 04 Y:1986 04 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,097 $3,500 Implemented
TN0286 # 05 Y:1986 05 1986 HEAT WATER WITH EXHAUST HEAT $875 $3,900 Not Implemented
TN0286 # 06 Y:1986 06 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,285 $615 Implemented
TN0286 # 07 Y:1986 07 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $744 $300 Implemented
TN0287 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,791 $0 Not Implemented
TN0287 # 02 Y:1986 02 1986 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $5,418 $17,075 Not Implemented
TN0287 # 03 Y:1986 03 1986 INSULATE BARE EQUIPMENT $1,458 $398 Not Implemented
TN0287 # 04 Y:1986 04 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $1,277 $750 Implemented
TN0287 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,422 $820 Not Implemented
TN0287 # 06 Y:1986 06 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $288 $1,000 Implemented
TN0287 # 07 Y:1986 07 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $159 $35 Implemented
TN0287 # 08 Y:1986 08 1986 INSTALL SET-BACK TIMERS $531 $0 Not Implemented
TN0287 # 09 Y:1986 09 1986 USE MINIMUM STEAM OPERATING PRESSURE $82 $0 Implemented
TN0288 # 01 Y:1986 01 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,032 $8,712 Not Implemented
TN0288 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,648 $0 Not Implemented
TN0288 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $881 $120 Implemented
TN0288 # 04 Y:1986 04 1986 INSTALL SET-BACK TIMERS $534 $0 Implemented
TN0288 # 05 Y:1986 05 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $537 $236 Implemented
TN0288 # 06 Y:1986 06 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $223 $600 Implemented
TN0289 # 01 Y:1986 01 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $64,485 $105,000 Not Implemented
TN0289 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,373 $4,500 Implemented
TN0289 # 03 Y:1986 03 1986 REPAIR AND ELIMINATE STEAM LEAKS $11,562 $150 Implemented
TN0289 # 04 Y:1986 04 1986 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $143,750 $40,000 Implemented