IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0667 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $15,168 $29,100 Not Implemented
TN0667 # 01 Y:1999 01 1999 RECOVER AND REUSE WASTE MATERIAL $222,220 $77,760 Not Implemented
TN0667 # 02 Y:1999 02 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $52,782 $80,100 Implemented
TN0667 # 05 Y:1999 05 1999 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,700 $21,780 Not Implemented
TN0645 # 05 Y:1998 05 1998 $198,225 $250,000 Not Implemented
TN0645 # 07 Y:1998 07 1998 USE DEIONIZED WATER IN UPSTREAM RINSE TANKS $48,650 $120,000 Not Implemented
TN0645 # 01 Y:1998 01 1998 ALLOW DRAINAGE BEFORE WITHDRAWING OBJECT $408,630 $24,685 Implemented
TN0645 # 03 Y:1998 03 1998 REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS $237,600 $153,485 Not Implemented
TN0645 # 10 Y:1998 10 1998 ELIMINATE LEAKS IN WATER LINES AND VALVES $9,390 $8,000 Implemented
TN0645 # 08 Y:1998 08 1998 TREAT AND REUSE RINSE WATERS $28,105 $69,200 Not Implemented
TN0645 # 11 Y:1998 11 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $5,000 Implemented
TN0645 # 13 Y:1998 13 1998 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,780 $14,300 Not Implemented
TN0645 # 09 Y:1998 09 1998 INSTALL SET-BACK TIMERS $15,755 $1,555 Not Implemented
TN0645 # 12 Y:1998 12 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,310 $1,120 Not Implemented
TN0645 # 02 Y:1998 02 1998 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $277,345 $644,800 Not Implemented
TN0645 # 06 Y:1998 06 1998 USE A DIFFERENT OR RECYCLED RAW MATERIAL $51,945 $200,000 Not Implemented
TN0645 # 04 Y:1998 04 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $221,455 $70,000 Not Implemented
TN0636 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $670 $220 Implemented
TN0636 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $490 $980 Not Implemented
TN0636 # 02 Y:1998 02 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,455 $0 Not Implemented
TN0636 # 01 Y:1998 01 1998 $46,480 $37,380 Not Implemented
TN0636 # 06 Y:1998 06 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $150 $600 Implemented
TN0636 # 05 Y:1998 05 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $175 $0 Implemented
TN0625 # 04 Y:1998 04 1998 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $9,965 $5,000 Implemented
TN0625 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,380 $6,370 Implemented