IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,950

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0598 # 02 Y:1997 02 1997 RECOVER AND REUSE WASTE MATERIAL $95,500 $12,800 n/a
TN0598 # 03 Y:1997 03 1997 $59,900 $10,000 n/a
TN0598 # 04 Y:1997 04 1997 $33,035 $13,000 n/a
TN0598 # 05 Y:1997 05 1997 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $30,661 $92,600 n/a
TN0598 # 06 Y:1997 06 1997 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,685 $13,600 n/a
TN0598 # 07 Y:1997 07 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $5,900 $0 n/a
TN0598 # 08 Y:1997 08 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,530 $9,800 n/a
TN0598 # 09 Y:1997 09 1997 RECOVER WASTE HEAT FROM EQUIPMENT $2,196 $4,750 n/a
TN0597 # 01 Y:1997 01 1997 $420,000 $0 Implemented
TN0597 # 02 Y:1997 02 1997 ELIMINATE THIRD SHIFT $35,200 $116,600 Not Implemented
TN0597 # 03 Y:1997 03 1997 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $10,210 $0 Implemented
TN0597 # 04 Y:1997 04 1997 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $4,865 $0 Implemented
TN0597 # 05 Y:1997 05 1997 USE A RAG RECYCLE SERVICE $3,800 $0 Not Implemented
TN0597 # 06 Y:1997 06 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,710 $2,000 Implemented
TN0597 # 07 Y:1997 07 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,180 $800 Implemented
TN0597 # 08 Y:1997 08 1997 INSTALL TIMERS AND/OR THERMOSTATS $1,830 $0 Implemented
TN0597 # 09 Y:1997 09 1997 MODIFY MATERIAL APPLICATION METHODS $1,560 $4,400 Implemented
TN0597 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $640 $460 Implemented
TN0596 # 01 Y:1996 01 1996 REDESIGN PROCESS $97,310 $38,900 Not Implemented
TN0596 # 02 Y:1996 02 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $80,150 $1,130 Implemented
TN0596 # 03 Y:1996 03 1996 RECOVER WASTE HEAT FROM EQUIPMENT $40,800 $99,260 Not Implemented
TN0596 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,300 $61,100 Not Implemented
TN0596 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,870 $4,200 Implemented
TN0596 # 06 Y:1996 06 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,170 $7,000 Implemented
TN0596 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $410 Implemented