IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0687 # 01 Y:2000 01 2000 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $25,255 $1,075 Implemented
TN0687 # 05 Y:2000 05 2000 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,280 $2,925 Not Implemented
TN0687 # 03 Y:2000 03 2000 TREAT AND REUSE RINSE WATERS $6,496 $14,340 Not Implemented
TN0687 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,703 $750 Implemented
TN0687 # 06 Y:2000 06 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,289 $2,150 Implemented
TN0687 # 09 Y:2000 09 2000 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $893 $2,950 Not Implemented
TN0687 # 04 Y:2000 04 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,210 $820 Implemented
TN0687 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,680 $350 Implemented
TN0687 # 10 Y:2000 10 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $720 $0 Implemented
TN0687 # 08 Y:2000 08 2000 INSULATE BARE EQUIPMENT $1,562 $188 Not Implemented
TN0666 # 12 Y:1999 12 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $4,100 $5,620 Not Implemented
TN0666 # 09 Y:1999 09 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,120 $1,460 Implemented
TN0666 # 06 Y:1999 06 1999 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,640 $4,620 Implemented
TN0666 # 04 Y:1999 04 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $9,945 $16,050 Not Implemented
TN0666 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $24,000 $45,920 Not Implemented
TN0666 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $5,902 $5,705 Implemented
TN0666 # 10 Y:1999 10 1999 USE SYNTHETIC LUBRICANT $900 $0 Implemented
TN0666 # 07 Y:1999 07 1999 INSTALL SKYLIGHTS $2,460 $5,070 Not Implemented
TN0666 # 08 Y:1999 08 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,433 $800 Implemented
TN0666 # 11 Y:1999 11 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $560 $1,200 Implemented
TN0666 # 13 Y:1999 13 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,380 $0 Not Implemented
TN0666 # 02 Y:1999 02 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $18,800 $16,000 Implemented
TN0666 # 03 Y:1999 03 1999 INSTALL TIMERS AND/OR THERMOSTATS $12,160 $3,250 Implemented
TN0667 # 06 Y:1999 06 1999 OPTIMIZE PLANT POWER FACTOR $15,168 $29,100 Not Implemented
TN0667 # 03 Y:1999 03 1999 METER WASTE WATER $26,280 $2,980 Implemented