IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

247

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0015 # 03 Y:2019 03 2019 INSTALL OCCUPANCY SENSORS $1,234 $616 Not Implemented
TR0015 # 04 Y:2019 04 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,095 $3,250 Implemented
TR0015 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,388 $0 Implemented
TR0015 # 06 Y:2019 06 2019 MAINTAIN MACHINES TO REDUCE LEAKS $1,094 $844 Implemented
TR0015 # 07 Y:2019 07 2019 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $483,876 $1,077,133 Not Implemented
TR0015 # 08 Y:2019 08 2019 REDUCE HEAT GAIN BY WINDOW TINTING $520 $483 Not Implemented
TR0014 # 01 Y:2019 01 2019 PAY UTILITY BILLS ON TIME $2,781 $0 Implemented
TR0014 # 02 Y:2019 02 2019 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,582 $0 Implemented
TR0014 # 03 Y:2019 03 2019 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $9,971 $8,500 Implemented
TR0014 # 04 Y:2019 04 2019 METER WASTE WATER $719 $1,511 Implemented
TR0014 # 05 Y:2019 05 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,996 $8,838 Implemented
TR0011 # 01 Y:2019 01 2019 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,048 $200 Not Implemented
TR0011 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,457 $7 Implemented
TR0011 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,336 $1,000 Implemented
TR0011 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,895 $10,120 Implemented
TR0011 # 05 Y:2019 05 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,830 $2,354 Implemented
TR0011 # 06 Y:2019 06 2019 UPGRADE OBSOLETE EQUIPMENT $5,435 $4,500 Implemented
TR0013 # 01 Y:2019 01 2019 INSTALL OCCUPANCY SENSORS $1,099 $216 Implemented
TR0013 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,439 $0 Implemented
TR0013 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,097 $7,743 Implemented
TR0012 # 01 Y:2019 01 2019 INSULATE BARE EQUIPMENT $5,267 $1,049 Implemented
TR0012 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,120 $5,616 Implemented
TR0012 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,664 $6,310 Implemented
TR0012 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $296 Implemented
TR0010 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $16,540 $17,881 Implemented