IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0237 # 07 Y:2020 07 2020 METER WASTE WATER $6,876 $2,000 Implemented
TT0237 # 05 Y:2020 05 2020 INSTALL TIMERS AND/OR THERMOSTATS $11,220 $20 Implemented
TT0237 # 03 Y:2020 03 2020 RECOVER WASTE HEAT FROM EQUIPMENT $12,785 $4,720 Not Implemented
TT0237 # 10 Y:2020 10 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $760 Implemented
TT0237 # 11 Y:2020 11 2020 DEVELOP A REPAIR/REPLACE POLICY $339 $653 Not Implemented
TT0237 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,445 $0 Implemented
TT0237 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,896 $10 Implemented
TT0237 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,481 $13,500 Not Implemented
TT0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,248 $3,360 Implemented
TT0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,403 $33,173 Implemented
TT0224 # 07 Y:2019 07 2019 UPGRADE CONTROLS ON COMPRESSORS $7,188 $600 Not Implemented
TT0224 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $45,228 $60,000 Not Implemented
TT0224 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,374 $16,645 Implemented
TT0224 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,405 $3,200 Implemented
TT0224 # 01 Y:2019 01 2019 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $119,892 $51,560 Implemented
TT0224 # 05 Y:2019 05 2019 INSTALL TIMERS AND/OR THERMOSTATS $14,353 $500 Implemented
TT0224 # 09 Y:2019 09 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,042 $640 Not Implemented
TT0224 # 10 Y:2019 10 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $792 $40 Not Implemented
TT0224 # 08 Y:2019 08 2019 USE OPTIMUM THICKNESS INSULATION $3,722 $10,752 Implemented
TT0224 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $9,767 $1,910 Not Implemented
TT0204 # 07 Y:2018 07 2018 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $968 $0 Implemented
TT0204 # 09 Y:2018 09 2018 INSTALL TIMERS AND/OR THERMOSTATS $402 $0 Implemented
TT0204 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $4,922 $20,000 Implemented
TT0204 # 05 Y:2018 05 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,633 $3,000 Implemented
TT0204 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94,373 $226,854 Implemented