IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2308 # 09 Y:2023 09 2023 INSTALL TIMERS AND/OR THERMOSTATS $998 $3,691 Implemented
UC2308 # 10 Y:2023 10 2023 ADOPT IN-HOUSE MATERIAL GENERATION $207,659 $464,727 Not Implemented
UC2308 # 11 Y:2023 11 2023 MODIFY STARTUP/SHUTDOWN TIMES $11,360 $7,140 Not Implemented
UC2308 # 12 Y:2023 12 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $85,414 $609,968 Not Implemented
UC2307 # 01 Y:2023 01 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $12,379 $0 Not Implemented
UC2307 # 02 Y:2023 02 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $4,994 $0 Not Implemented
UC2307 # 03 Y:2023 03 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $352 $0 Not Implemented
UC2307 # 04 Y:2023 04 2023 REPLACE BOILER $6,269 $41,061 Not Implemented
UC2307 # 05 Y:2023 05 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $508 $529 Not Implemented
UC2307 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $411 $3,486 Not Implemented
UC2307 # 07 Y:2023 07 2023 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,643 $34,992 Not Implemented
UC2307 # 08 Y:2023 08 2023 METER WASTE WATER $383 $455 Not Implemented
UC2307 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,108 $31,637 Not Implemented
UC2307 # 10 Y:2023 10 2023 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,667 $13,200 Not Implemented
UC2306 # 01 Y:2023 01 2023 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $2,520 $0 Not Implemented
UC2306 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,636 $11,635 Implemented
UC2306 # 03 Y:2023 03 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $375 $0 Implemented
UC2306 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $795 $600 Not Implemented
UC2306 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,621 $1,600 Not Implemented
UC2306 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,539 $385,242 Not Implemented
UC2306 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,153 $34,274 Implemented
UC2306 # 08 Y:2023 08 2023 INSTALL TIMERS AND/OR THERMOSTATS $1,986 $3,066 Not Implemented
UC2306 # 09 Y:2023 09 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,865 $22,297 Not Implemented
UC2306 # 10 Y:2023 10 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $207 $733 Not Implemented
UC2306 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $429 $1,916 Not Implemented