Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
342
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UC2314 # 07 Y:2023 | 07 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,082 | $1,674 | n/a |
UC2314 # 08 Y:2023 | 08 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,033 | $0 | n/a |
UC2314 # 09 Y:2023 | 09 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $14,221 | $0 | n/a |
UC2314 # 10 Y:2023 | 10 | 2023 | REPLACE BOILER | $8,265 | $39,281 | n/a |
UC2314 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $197,753 | $1,537,591 | n/a |
UC2314 # 12 Y:2023 | 12 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $26,966 | $395,108 | n/a |
UC2314 # 13 Y:2023 | 13 | 2023 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $24,735 | $170,000 | n/a |
UC2314 # 14 Y:2023 | 14 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,261 | $34,348 | n/a |
UC2314 # 15 Y:2023 | 15 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $17,312 | $39,269 | n/a |
UC2313 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $275 | $0 | n/a |
UC2313 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,527 | $1,500 | n/a |
UC2313 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,066 | $3,500 | n/a |
UC2313 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $428 | n/a |
UC2313 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $873 | $1,300 | n/a |
UC2313 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $251 | $50 | n/a |
UC2313 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,805 | $75 | n/a |
UC2313 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $16,157 | n/a |
UC2313 # 09 Y:2023 | 09 | 2023 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $4,673 | $19,488 | n/a |
UC2313 # 10 Y:2023 | 10 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $615 | $1,053 | n/a |
UC2312 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,161 | $428 | Not Implemented |
UC2312 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,426 | $1,300 | Implemented |
UC2312 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,502 | $150 | Implemented |
UC2312 # 04 Y:2023 | 04 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,573 | $75 | Implemented |
UC2312 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,710 | $1,062 | Implemented |
UC2312 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,947 | $9,514 | Not Implemented |