IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

281

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1051 # 11 Y:2023 11 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,057 $18,480 Not Implemented
UD1051 # 08 Y:2023 08 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $33,383 $25,920 Not Implemented
UD1051 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,461 $0 Implemented
UD1051 # 06 Y:2023 06 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,807 $0 Implemented
UD1051 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,689 $325 Implemented
UD1051 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $703 $0 Implemented
UD1051 # 05 Y:2023 05 2023 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $106,038 $57,050 Not Implemented
UD1051 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $14,358 $18,834 Not Implemented
UD1051 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,158 $92,100 Not Implemented
UD1051 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,083 $0 Implemented
UD1051 # 12 Y:2023 12 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $633 $80 Not Implemented
UD1051 # 10 Y:2023 10 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $969 $3,439 Not Implemented
UD0888 # 20 Y:2013 20 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $412 $0 Implemented
UD0888 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,284 $15,000 Implemented
UD0888 # 17 Y:2013 17 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,679 $5,000 Not Implemented
UD0888 # 03 Y:2013 03 2013 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $23,080 $10,000 Not Implemented
UD0888 # 18 Y:2013 18 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $21,538 $2,500 Not Implemented
UD0888 # 08 Y:2013 08 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $0 Implemented
UD0888 # 12 Y:2013 12 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $20,092 $0 Implemented
UD0888 # 13 Y:2013 13 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,444 $4,500 Not Implemented
UD0888 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $841 $0 Implemented
UD0888 # 19 Y:2013 19 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $262,538 $700,000 Not Implemented
UD0888 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $7,011 $0 Implemented
UD0888 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,246 $3,000 Implemented
UD0888 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,510 $5,000 Implemented