Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
281
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1051 # 11 Y:2023 | 11 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,057 | $18,480 | Not Implemented |
UD1051 # 08 Y:2023 | 08 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $33,383 | $25,920 | Not Implemented |
UD1051 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,461 | $0 | Implemented |
UD1051 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,807 | $0 | Implemented |
UD1051 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,689 | $325 | Implemented |
UD1051 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $703 | $0 | Implemented |
UD1051 # 05 Y:2023 | 05 | 2023 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $106,038 | $57,050 | Not Implemented |
UD1051 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $14,358 | $18,834 | Not Implemented |
UD1051 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,158 | $92,100 | Not Implemented |
UD1051 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,083 | $0 | Implemented |
UD1051 # 12 Y:2023 | 12 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $633 | $80 | Not Implemented |
UD1051 # 10 Y:2023 | 10 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $969 | $3,439 | Not Implemented |
UD0888 # 20 Y:2013 | 20 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $412 | $0 | Implemented |
UD0888 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,284 | $15,000 | Implemented |
UD0888 # 17 Y:2013 | 17 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,679 | $5,000 | Not Implemented |
UD0888 # 03 Y:2013 | 03 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $23,080 | $10,000 | Not Implemented |
UD0888 # 18 Y:2013 | 18 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $21,538 | $2,500 | Not Implemented |
UD0888 # 08 Y:2013 | 08 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,313 | $0 | Implemented |
UD0888 # 12 Y:2013 | 12 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,092 | $0 | Implemented |
UD0888 # 13 Y:2013 | 13 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,444 | $4,500 | Not Implemented |
UD0888 # 02 Y:2013 | 02 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $841 | $0 | Implemented |
UD0888 # 19 Y:2013 | 19 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $262,538 | $700,000 | Not Implemented |
UD0888 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,011 | $0 | Implemented |
UD0888 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,246 | $3,000 | Implemented |
UD0888 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,510 | $5,000 | Implemented |