Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,205
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1109 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $41,149 | $75,000 | n/a |
UD1109 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,965 | $2,310 | n/a |
UD1109 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,017 | $2,784 | n/a |
UD1109 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,579 | $0 | n/a |
UD1109 # 05 Y:2025 | 05 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,167 | $4,639 | n/a |
UD1107 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,345 | $953 | n/a |
UD1107 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,839 | $5,280 | n/a |
UD1107 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $69,274 | $0 | n/a |
UD1107 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $228,685 | $136,500 | n/a |
UD1107 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $412 | $900 | n/a |
UD1108 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,247 | $34,400 | n/a |
UD1108 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $393 | $8,738 | n/a |
UD1108 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $407,706 | $6,324,150 | n/a |
UD1108 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $14,400 | n/a |
UD1106 # 03 Y:2025 | 03 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,902 | $8,000 | n/a |
UD1106 # 01 Y:2025 | 01 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,990 | $0 | n/a |
UD1106 # 02 Y:2025 | 02 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $411 | $1,920 | n/a |
UD1102 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,605 | $8,161 | n/a |
UD1102 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $148 | $449 | n/a |
UD1102 # 07 Y:2025 | 07 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $326,496 | $385,000 | n/a |
UD1102 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $798 | $1,000 | n/a |
UD1102 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $9,007 | $30,514 | n/a |
UD1102 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,527 | $900 | n/a |
UD1102 # 01 Y:2025 | 01 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $52,334 | $0 | n/a |
UD1102 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,572 | $16,800 | n/a |