Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
84
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1109 # 04 Y:2025 | 04 | 2025 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $41,149 | $75,000 | n/a |
UD1109 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,017 | $2,784 | n/a |
UD1109 # 05 Y:2025 | 05 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,167 | $4,639 | n/a |
UD1109 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,579 | $0 | n/a |
UD1109 # 01 Y:2025 | 01 | 2025 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,965 | $2,310 | n/a |
UD1107 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $412 | $900 | n/a |
UD1107 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $69,274 | $0 | n/a |
UD1107 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,345 | $953 | n/a |
UD1107 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $228,685 | $136,500 | n/a |
UD1107 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,839 | $5,280 | n/a |
UD1108 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,982 | $14,400 | n/a |
UD1108 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $393 | $8,738 | n/a |
UD1108 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $407,706 | $6,324,150 | n/a |
UD1108 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,247 | $34,400 | n/a |
UD1106 # 01 Y:2025 | 01 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,990 | $0 | n/a |
UD1106 # 03 Y:2025 | 03 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,902 | $8,000 | n/a |
UD1106 # 02 Y:2025 | 02 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $411 | $1,920 | n/a |
UD1102 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $148 | $449 | n/a |
UD1102 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $9,007 | $30,514 | n/a |
UD1102 # 01 Y:2025 | 01 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $52,334 | $0 | n/a |
UD1102 # 02 Y:2025 | 02 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,107 | $2,722 | n/a |
UD1102 # 03 Y:2025 | 03 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $798 | $1,000 | n/a |
UD1102 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $61,605 | $8,161 | n/a |
UD1102 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $15,572 | $16,800 | n/a |
UD1102 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,527 | $900 | n/a |