Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,799
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0412 # 05 Y:2008 | 05 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $17,781 | $615 | Implemented |
UF0412 # 06 Y:2008 | 06 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $2,521 | $0 | Implemented |
UF0412 # 07 Y:2008 | 07 | 2008 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $2,081 | $534 | Not Implemented |
UF0412 # 08 Y:2008 | 08 | 2008 | INSTALL SET-BACK TIMERS | $15,103 | $4,916 | Implemented |
UF0412 # 09 Y:2008 | 09 | 2008 | CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS | $1,822 | $10,480 | Implemented |
UF0412 # 10 Y:2008 | 10 | 2008 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $95,676 | $20,000 | Not Implemented |
UF0412 # 11 Y:2008 | 11 | 2008 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,359 | $4,246 | Implemented |
UF0411 # 01 Y:2008 | 01 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,719 | $4,557 | Not Implemented |
UF0411 # 02 Y:2008 | 02 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $47,620 | $6,301 | Not Implemented |
UF0411 # 03 Y:2008 | 03 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,287 | $40,292 | Implemented |
UF0411 # 04 Y:2008 | 04 | 2008 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $3,258 | $461 | Implemented |
UF0411 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $1,200 | $215 | Implemented |
UF0411 # 06 Y:2008 | 06 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $888 | $364 | Not Implemented |
UF0411 # 07 Y:2008 | 07 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,348 | $20,000 | Not Implemented |
UF0411 # 08 Y:2008 | 08 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,520 | $1,000 | Not Implemented |
UF0411 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $53,144 | $426 | Implemented |
UF0411 # 10 Y:2008 | 10 | 2008 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $10,946 | $25,280 | Not Implemented |
UF0411 # 11 Y:2008 | 11 | 2008 | MODIFY WORKLOAD | $8,002 | $0 | Not Implemented |
UF0411 # 12 Y:2008 | 12 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,419 | $3,400 | Not Implemented |
UF0411 # 13 Y:2008 | 13 | 2008 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $110,982 | $0 | Implemented |
UF0410 # 01 Y:2008 | 01 | 2008 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,868 | $27,216 | Not Implemented |
UF0410 # 02 Y:2008 | 02 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,023 | $19,505 | Not Implemented |
UF0410 # 03 Y:2008 | 03 | 2008 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,665 | $459 | Implemented |
UF0410 # 04 Y:2008 | 04 | 2008 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,229 | $233 | Implemented |
UF0410 # 05 Y:2008 | 05 | 2008 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,494 | $0 | Implemented |