Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
220
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0312 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $38,400 | $31,277 | Not Implemented |
UF0312 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,162 | $7,981 | Implemented |
UF0312 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,427 | $20,000 | Implemented |
UF0312 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $1,258 | $6,000 | Not Implemented |
UF0312 # 06 Y:2002 | 06 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,131 | $1,074 | Implemented |
UF0312 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,934 | $500 | Not Implemented |
UF0311 # 03 Y:2002 | 03 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,246 | $0 | Not Implemented |
UF0311 # 06 Y:2002 | 06 | 2002 | RECYCLE FLUORESCENT LAMPS | $10,412 | $1,895 | Not Implemented |
UF0311 # 05 Y:2002 | 05 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $31,940 | $189,000 | Not Implemented |
UF0311 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,935 | $119,640 | Not Implemented |
UF0311 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $20,300 | $1,640 | Implemented |
UF0311 # 04 Y:2002 | 04 | 2002 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $15,812 | $20,000 | Implemented |
UF0306 # 05 Y:2002 | 05 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $10,048 | $0 | Not Implemented |
UF0306 # 04 Y:2002 | 04 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $592,558 | $1,120,000 | Not Implemented |
UF0306 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,153 | $5,064 | Implemented |
UF0306 # 06 Y:2002 | 06 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $48,671 | $1,074 | Not Implemented |
UF0306 # 08 Y:2002 | 08 | 2002 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $107,170 | $114,485 | Not Implemented |
UF0306 # 03 Y:2002 | 03 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,327 | $0 | Implemented |
UF0306 # 07 Y:2002 | 07 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $208,938 | $33,980 | Not Implemented |
UF0306 # 02 Y:2002 | 02 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,764 | $7,800 | Not Implemented |
UF0310 # 07 Y:2002 | 07 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,038 | $0 | Not Implemented |
UF0310 # 05 Y:2002 | 05 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $16,134 | $32,723 | Not Implemented |
UF0310 # 03 Y:2002 | 03 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $27,021 | $84,100 | Not Implemented |
UF0310 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,954 | $340 | Not Implemented |
UF0310 # 02 Y:2002 | 02 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $57,004 | $97,500 | Not Implemented |