Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
52
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0569 # 11 Y:2021 | 11 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,822 | $0 | Implemented |
UF0569 # 07 Y:2021 | 07 | 2021 | USE OPTIMUM TEMPERATURE | $3,887 | $0 | Implemented |
UF0569 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,252 | $1,985 | Implemented |
UF0569 # 05 Y:2021 | 05 | 2021 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $11,660 | $40,000 | Not Implemented |
UF0569 # 04 Y:2021 | 04 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,766 | $5,229 | Implemented |
UF0569 # 03 Y:2021 | 03 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $16,113 | $14,830 | Not Implemented |
UF0569 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $18,925 | $25,340 | Not Implemented |
UF0569 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,828 | $23,023 | Implemented |
UF0569 # 10 Y:2021 | 10 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,868 | $0 | Implemented |
UF0569 # 08 Y:2021 | 08 | 2021 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,742 | $3,746 | Not Implemented |
UF0569 # 09 Y:2021 | 09 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,071 | $495 | Implemented |
UF0568 # 04 Y:2021 | 04 | 2021 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $8,146 | $700 | Not Implemented |
UF0568 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $3,117 | $9,240 | Implemented |
UF0568 # 06 Y:2021 | 06 | 2021 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $1,828 | $0 | Not Implemented |
UF0568 # 07 Y:2021 | 07 | 2021 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,670,260 | $53,000 | Not Implemented |
UF0568 # 08 Y:2021 | 08 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $8,760 | $8,000 | Not Implemented |
UF0568 # 09 Y:2021 | 09 | 2021 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $3,655 | $0 | Implemented |
UF0568 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,182 | $12,247 | Implemented |
UF0568 # 02 Y:2021 | 02 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $20,147 | $49,165 | Implemented |
UF0568 # 01 Y:2021 | 01 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $52,474 | $147,852 | Not Implemented |
UF0567 # 01 Y:2021 | 01 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $123,727 | $246,613 | Implemented |
UF0567 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $95,985 | $228,343 | Implemented |
UF0567 # 07 Y:2021 | 07 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $8,760 | $8,000 | Not Implemented |
UF0567 # 04 Y:2021 | 04 | 2021 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $9,372 | $14,250 | Implemented |
UF0567 # 06 Y:2021 | 06 | 2021 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $2,719,160 | $106,000 | Not Implemented |