IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2105 # 09 Y:2021 09 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,619 $644 n/a
UK2105 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,309 $2,702 n/a
UK2105 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,473 $3,200 n/a
UK2104 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $26,160 $9,000 n/a
UK2104 # 01 Y:2021 01 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,514 $444 n/a
UK2104 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $231 $650 n/a
UK2104 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,021 $2,633 n/a
UK2104 # 08 Y:2021 08 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,003 $0 n/a
UK2104 # 09 Y:2021 09 2021 REPLACE TREATED WATER WITH WELL / SURFACE WATER $13,774 $4,000 n/a
UK2104 # 07 Y:2021 07 2021 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,415 $13,780 n/a
UK2104 # 06 Y:2021 06 2021 REDESIGN PROCESS $16,187 $25,000 n/a
UK2104 # 10 Y:2021 10 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $356 $78 n/a
UK2104 # 04 Y:2021 04 2021 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $85 $285 n/a
UK2103 # 04 Y:2021 04 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $328 $0 n/a
UK2103 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,386 $4,128 n/a
UK2103 # 02 Y:2021 02 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $54 $63 n/a
UK2103 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $51,422 $0 n/a
UK2101 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,735 $6,438 n/a
UK2101 # 06 Y:2021 06 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $16,094 $170 n/a
UK2101 # 10 Y:2021 10 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,968 $15,000 n/a
UK2101 # 07 Y:2021 07 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $32,159 $7,382 n/a
UK2101 # 12 Y:2021 12 2021 COMBINE UTILITY METERS $72,182 $150,000 n/a
UK2101 # 13 Y:2021 13 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $171,872 $1,684,348 n/a
UK2101 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $6,495 $2,215 n/a
UK2101 # 08 Y:2021 08 2021 INSTALL OCCUPANCY SENSORS $783 $2,210 n/a