IAC logo
IAC Assessment: UK2104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UK2104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Kentucky
Assessment Year 2021
Principal Product wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 3
Plant Area (Sq.Ft.) 200,000
Annual Production 365,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $28,974 939,520 kWh $0.03
Electricity Demand $50,308 2,301 kW-months/year $21.86
Electricity Fees $1,167 - $ -
TOTAL ENERGY COSTS $80,449
RECOMMENDED SAVINGS* $91,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Other Liquid (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ gal $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,514
Cost:
$444
$771 24,878 $743 34 - - - - - - - - $771
24,878
kWh
$743
34
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,021
Cost:
$2,633
$556 17,945 $1,465 67 - - - - - - - - $556
17,945
kWh
$1,465
67
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$231
Cost:
$650
$231 7,437 - - - - - - - - - - $231
7,437
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
04: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$85
Cost:
$285
$85 2,754 - - - - - - - - - - $85
2,754
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$26,160
Cost:
$9,000
$13,306 429,240 $12,854 588 - - - - - - - - $13,306
429,240
kWh
$12,854
588
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
06: 2.5194 REDESIGN PROCESS Savings:
$16,187
Cost:
$25,000
$3,259 105,120 $3,148 144 - - - - $9,780 - - - $3,259
105,120
kWh
$3,148
144
kW-months/year
-
-
Tgal
-
-
gal
$9,780
-
$
-
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$10,415
Cost:
$13,780
$(-48) (-1,560) $(-197) (-9) - - $1,560 520 $9,100 - - - $(-48)
(-1,560)
kWh
$(-197)
(-9)
kW-months/year
-
-
Tgal
$1,560
520
gal
$9,100
-
$
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$21,003
Cost:
-
$1,629 52,560 $1,574 72 - - - - - - $17,800 - $1,629
52,560
kWh
$1,574
72
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
$17,800
-
$
09: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$13,774
Cost:
$4,000
$(-361) (-11,638) $(-1,465) (-67) $15,600 7,800 - - - - - - $(-361)
(-11,638)
kWh
$(-1,465)
(-67)
kW-months/year
$15,600
7,800
Tgal
-
-
gal
-
-
$
-
-
$
10: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$356
Cost:
$78
$356 11,468 - - - - - - - - - - $356
11,468
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$91,746
Cost:
$55,870
$19,784 638,204 $18,122 829 $15,600 7,800 $1,560 520 $18,880 - $17,800 - $19,784
638,204
kWh
$18,122
829
kW-months/year
$15,600
7,800
Tgal
$1,560
520
gal
$18,880
-
$
$17,800
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ $ $ $
Electricity Usage Electricity Demand Water Usage Other Liquid (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Other Liquid (non-haz) Personnel Changes Ancillary Material Cost