Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,083
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2403 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,407 | $9,750 | n/a |
UL2403 # 08 Y:2024 | 08 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $680 | $0 | n/a |
UL2403 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,803 | $0 | n/a |
UL2403 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $32,359 | $12,025 | n/a |
UL2403 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $181 | $779 | n/a |
UL2403 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,533 | $548,395 | n/a |
UL2403 # 01 Y:2024 | 01 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,606 | $77,327 | n/a |
UL2403 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,498 | $1,785 | n/a |
UL2403 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,568 | $3,839 | n/a |
UL2402 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,801 | $3,150 | n/a |
UL2402 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $677 | $0 | n/a |
UL2402 # 01 Y:2024 | 01 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,664 | $1,130 | n/a |
UL2402 # 05 Y:2024 | 05 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $176,163 | $90,792 | n/a |
UL2402 # 02 Y:2024 | 02 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,889 | $0 | n/a |
UL2402 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,025 | $1,560,993 | n/a |
UL2401 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,468 | $1,000 | n/a |
UL2401 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,830 | $0 | n/a |
UL2401 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $2,270 | n/a |
UL2401 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $17,320 | $13,000 | n/a |
UL2401 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $54,908 | $450,549 | n/a |
UL2401 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,727 | $3,600 | n/a |
UL2401 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $191 | $504 | n/a |
UL2318 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,695 | $2,160 | n/a |
UL2318 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,688 | $501,748 | n/a |
UL2318 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,113 | $0 | n/a |