Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
87
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0359 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,026 | $50,000 | Implemented |
UM0359 # 05 Y:2009 | 05 | 2009 | INSTALL STORM WINDOWS AND DOORS | $6,298 | $24,510 | Implemented |
UM0359 # 10 Y:2009 | 10 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $472 | $10,000 | Implemented |
UM0359 # 06 Y:2009 | 06 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,724 | $7,574 | Not Implemented |
UM0359 # 08 Y:2009 | 08 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,620 | $10,000 | Implemented |
UM0359 # 03 Y:2009 | 03 | 2009 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $13,963 | $400 | Implemented |
UM0359 # 04 Y:2009 | 04 | 2009 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $11,980 | $9,000 | Not Implemented |
UM0359 # 01 Y:2009 | 01 | 2009 | REDUCE VENTILATION AIR | $20,146 | $500 | Implemented |
UM0359 # 09 Y:2009 | 09 | 2009 | INSTALL OCCUPANCY SENSORS | $1,161 | $30,000 | Implemented |
UM0359 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,630 | $5,000 | Not Implemented |
UM0358 # 04 Y:2009 | 04 | 2009 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,766 | $1,200 | Not Implemented |
UM0358 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $69 | $62 | Implemented |
UM0358 # 06 Y:2009 | 06 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,552 | $36,000 | Implemented |
UM0358 # 01 Y:2009 | 01 | 2009 | ISOLATE HOT OR COLD EQUIPMENT | $21,998 | $720 | Implemented |
UM0358 # 07 Y:2009 | 07 | 2009 | INSULATE BARE EQUIPMENT | $5,125 | $11,770 | Implemented |
UM0358 # 03 Y:2009 | 03 | 2009 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,994 | $10,960 | Not Implemented |
UM0358 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,988 | $23,603 | Implemented |
UM0357 # 02 Y:2009 | 02 | 2009 | USE RADIANT HEATER FOR SPOT HEATING | $48,733 | $25,000 | Implemented |
UM0357 # 04 Y:2009 | 04 | 2009 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $5,524 | $2,591 | Implemented |
UM0357 # 05 Y:2009 | 05 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,523 | $1,359 | Implemented |
UM0357 # 01 Y:2009 | 01 | 2009 | INSTALL STORM WINDOWS AND DOORS | $88,261 | $361,980 | Implemented |
UM0357 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,053 | $42,818 | Implemented |
UM0357 # 07 Y:2009 | 07 | 2009 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,875 | $7,500 | Implemented |
UM0357 # 06 Y:2009 | 06 | 2009 | INSTALL OCCUPANCY SENSORS | $1,466 | $4,692 | Implemented |
UM0356 # 04 Y:2009 | 04 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,510 | $3,000 | Not Implemented |