Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0235 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,664 | $1,013 | Implemented |
UU0236 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $5,640 | $3,090 | Implemented |
UU0236 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $16,698 | $11,570 | Implemented |
UU0236 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $72,320 | $46,000 | Implemented |
UU0236 # 01 Y:2024 | 01 | 2024 | REPLACE BOILER | $208,300 | $1,070,720 | Implemented |
UU0225 # 05 Y:2023 | 05 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,851 | $2,775 | Implemented |
UU0225 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,399 | $15,200 | Implemented |
UU0225 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,047 | $11,922 | Implemented |
UU0225 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,874 | $0 | Implemented |
UU0225 # 01 Y:2023 | 01 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $39,842 | $126,388 | Implemented |
UU0224 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,361 | $1,485 | Implemented |
UU0224 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,460 | $1,382 | Implemented |
UU0224 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,006 | $10,650 | Implemented |
UU0224 # 02 Y:2023 | 02 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,206 | $7,560 | Implemented |
UU0224 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,006 | $51 | Implemented |
UU0099 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,230 | $2,510 | Implemented |
UU0099 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,650 | $0 | Implemented |
UU0067 # 04 Y:2004 | 04 | 2004 | INSTALL WIND POWERED ELECTRIC GENERATOR | $0 | $0 | Implemented |
UU0067 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $25,126 | $0 | Implemented |
UU0061 # 06 Y:2004 | 06 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $351 | $432 | Implemented |
UU0061 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $274 | $0 | Implemented |
UU0056 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $325 | $121 | Implemented |
UU0056 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $110 | $490 | Implemented |
UU0056 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $58 | Implemented |