IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

96

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0225 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,399 $15,200 Implemented
UU0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,047 $11,922 Implemented
UU0225 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,874 $0 Implemented
UU0225 # 01 Y:2023 01 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,842 $126,388 Implemented
UU0224 # 02 Y:2023 02 2023 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $10,206 $7,560 Implemented
UU0224 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,006 $51 Implemented
UU0224 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,006 $10,650 Implemented
UU0224 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,361 $1,485 Implemented
UU0224 # 05 Y:2023 05 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,224 $4,500 Not Implemented
UU0224 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,460 $1,382 Implemented
UU0099 # 07 Y:2006 07 2006 OPTIMIZE PLANT POWER FACTOR $8,020 $14,000 Not Implemented
UU0099 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,230 $2,510 Implemented
UU0099 # 05 Y:2006 05 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,100 $21,000 Not Implemented
UU0099 # 04 Y:2006 04 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $15,029 $7,500 Not Implemented
UU0099 # 03 Y:2006 03 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $36,960 $164,490 Not Implemented
UU0099 # 02 Y:2006 02 2006 ISOLATE HOT OR COLD EQUIPMENT $1,350 $0 Not Implemented
UU0099 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,650 $0 Implemented
UU0093 # 01 Y:2005 01 2005 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $336,460 $336,000 Not Implemented
UU0093 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $777 $2,000 Not Implemented
UU0093 # 05 Y:2005 05 2005 PAY UTILITY BILLS ON TIME $1,418 $0 Not Implemented
UU0093 # 04 Y:2005 04 2005 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,080 $0 Not Implemented
UU0093 # 03 Y:2005 03 2005 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $350 $2,000 Not Implemented
UU0093 # 02 Y:2005 02 2005 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $727 $495 Not Implemented
UU0079 # 06 Y:2005 06 2005 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $284,540 $3,000,000 Not Implemented
UU0079 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $340 $1,380 Not Implemented