Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
144
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0078 # 07 Y:2004 | 07 | 2004 | OPTIMIZE PLANT POWER FACTOR | $10,400 | $11,590 | Not Implemented |
UU0078 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $405 | Implemented |
UU0078 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,890 | $4,820 | Implemented |
UU0078 # 01 Y:2004 | 01 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $6,850 | $10,000 | Not Implemented |
UU0078 # 08 Y:2004 | 08 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $810 | $450 | Implemented |
UU0078 # 06 Y:2004 | 06 | 2004 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $5,720 | $1,120 | Not Implemented |
UU0078 # 05 Y:2004 | 05 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,620 | $12,000 | Not Implemented |
UU0078 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,970 | $400 | Implemented |
UU0077 # 01 Y:2004 | 01 | 2004 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $12,125 | $2,670 | Not Implemented |
UU0077 # 03 Y:2004 | 03 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $14,890 | $45,000 | Implemented |
UU0077 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,520 | $5,000 | Implemented |
UU0077 # 04 Y:2004 | 04 | 2004 | ADJUST PH FOR NEUTRALIZATION | $12,850 | $45,920 | Not Implemented |
UU0076 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,300 | $4,824 | Not Implemented |
UU0076 # 05 Y:2004 | 05 | 2004 | METER WASTE WATER | $5,360 | $1,500 | Not Implemented |
UU0076 # 03 Y:2004 | 03 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30 | $0 | Not Implemented |
UU0076 # 06 Y:2004 | 06 | 2004 | OPTIMIZE PLANT POWER FACTOR | $1,982 | $2,220 | Not Implemented |
UU0076 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24 | $40 | Not Implemented |
UU0076 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,600 | $2,000 | Not Implemented |
UU0075 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,700 | $8,000 | Not Implemented |
UU0075 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,590 | $1,320 | Implemented |
UU0075 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $980 | $4,500 | Not Implemented |
UU0075 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,270 | $1,000 | Implemented |
UU0075 # 06 Y:2004 | 06 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,540 | $8,000 | Not Implemented |
UU0075 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,120 | $150 | Implemented |
UU0075 # 01 Y:2004 | 01 | 2004 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $400 | $250 | Not Implemented |