Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
118
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0208 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $9,375 | $9,500 | Not Implemented |
UU0208 # 05 Y:2022 | 05 | 2022 | INSTALL SKYLIGHTS | $3,058 | $10,560 | Not Implemented |
UU0208 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,445 | $12,840 | Implemented |
UU0208 # 02 Y:2022 | 02 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,476 | $127,045 | Implemented |
UU0208 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,292 | $7,290 | Implemented |
UU0208 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $230 | $107 | Implemented |
UU0209 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,767 | $6,406 | Not Implemented |
UU0209 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,311 | $900 | Implemented |
UU0209 # 05 Y:2022 | 05 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,347 | $1,395 | Implemented |
UU0209 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,206 | $5,920 | Implemented |
UU0209 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,279 | $1,600 | Implemented |
UU0209 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,247 | $850 | Not Implemented |
UU0209 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,593 | $20,930 | Not Implemented |
UU0207 # 03 Y:2022 | 03 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $6,884 | $750 | Implemented |
UU0207 # 08 Y:2022 | 08 | 2022 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $265 | $750 | Implemented |
UU0207 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $850 | $1,000 | Implemented |
UU0207 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $4,008 | $3,433 | Implemented |
UU0207 # 05 Y:2022 | 05 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,912 | $1,585 | Implemented |
UU0207 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,250 | $5,000 | Not Implemented |
UU0207 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $626 | $1,700 | Implemented |
UU0207 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO HEAT WATER | $15,757 | $75,487 | Not Implemented |
UU0206 # 08 Y:2022 | 08 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,802 | $1,125 | Not Implemented |
UU0206 # 03 Y:2022 | 03 | 2022 | MODIFY STARTUP/SHUTDOWN TIMES | $15,730 | $3,713 | Implemented |
UU0206 # 07 Y:2022 | 07 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,868 | $1,019 | Implemented |
UU0206 # 06 Y:2022 | 06 | 2022 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,388 | $5,440 | Not Implemented |