IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

430

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0024 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $0 Implemented
UW0024 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $889 $0 Implemented
UW0024 # 05 Y:2009 05 2009 MINIMIZE WATER USAGE $3,573 $0 Implemented
UW0023 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,974 $120,000 Implemented
UW0023 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,851 $2,500 Implemented
UW0023 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $7,267 $200,000 Implemented
UW0023 # 04 Y:2009 04 2009 CONTROL PRESSURE ON STEAMER OPERATIONS $6,132 $0 Not Implemented
UW0023 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,120 $60,200 Not Implemented
UW0022 # 01 Y:2008 01 2008 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $89,303 $52,321 Not Implemented
UW0022 # 02 Y:2008 02 2008 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $44,200 $27,200 Not Implemented
UW0022 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,636 $4,640 Implemented
UW0022 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,233 $9,804 Not Implemented
UW0022 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,153 $0 Not Implemented
UW0022 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,172 $180 Implemented
UW0022 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $2,130 $1,260 Not Implemented
UW0022 # 08 Y:2008 08 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,849 $14,505 Not Implemented
UW0019 # 01 Y:2008 01 2008 REPLACE BOILER $16,074 $25,870 Implemented
UW0019 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $15,042 $2,500 Not Implemented
UW0019 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $14,046 $2,908 Not Implemented
UW0019 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $4,446 $2,439 Not Implemented
UW0020 # 01 Y:2008 01 2008 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $115,054 $172,581 Not Implemented
UW0020 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,000 $24,547 Not Implemented
UW0020 # 03 Y:2008 03 2008 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $8,002 $34,238 Not Implemented
UW0020 # 04 Y:2008 04 2008 UPGRADE CONTROLS ON COMPRESSORS $1,828 $450 Implemented
UW0020 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $403 $145 Implemented