IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0206 # 09 Y:1994 09 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $255 $0 Not Implemented
WI0205 # 01 Y:1994 01 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,212 $11,695 Implemented
WI0205 # 02 Y:1994 02 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,751 $15,000 Not Implemented
WI0205 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,651 $0 Not Implemented
WI0205 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $578 $1,000 Not Implemented
WI0205 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,492 Implemented
WI0205 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,578 $0 Implemented
WI0205 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $961 $450 Implemented
WI0205 # 08 Y:1994 08 1994 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,321 $0 Not Implemented
WI0205 # 09 Y:1994 09 1994 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,074 $500 Implemented
WI0205 # 10 Y:1994 10 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,362 $800 Implemented
WI0205 # 11 Y:1994 11 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $977 $500 Implemented
WI0205 # 12 Y:1994 12 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $16,370 $10,000 Not Implemented
WI0204 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $19,288 $10,000 Not Implemented
WI0204 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,124 $500 Implemented
WI0204 # 03 Y:1994 03 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,431 $1,400 Not Implemented
WI0204 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $491 $1,920 Not Implemented
WI0204 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $488 $0 Implemented
WI0204 # 06 Y:1994 06 1994 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $18,227 $66,000 Implemented
WI0204 # 07 Y:1994 07 1994 ELIMINATE/REDUCE AN OPERATION $3,499 $6,000 Not Implemented
WI0203 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,689 $1,400 Implemented
WI0203 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,768 $4,650 Implemented
WI0203 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,102 $2,259 Not Implemented
WI0203 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $227 $300 Not Implemented
WI0203 # 05 Y:1994 05 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,743 $2,844 Implemented