Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,119
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0267 # 03 Y:1996 | 03 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,729 | $45,000 | n/a |
WI0267 # 04 Y:1996 | 04 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $13,635 | $39,000 | n/a |
WI0267 # 05 Y:1996 | 05 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $9,054 | $16,740 | n/a |
WI0267 # 06 Y:1996 | 06 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $6,670 | $0 | n/a |
WI0267 # 07 Y:1996 | 07 | 1996 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $4,867 | $0 | n/a |
WI0267 # 08 Y:1996 | 08 | 1996 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,040 | $0 | n/a |
WI0267 # 09 Y:1996 | 09 | 1996 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,236 | $5,000 | n/a |
WI0257 # 01 Y:1996 | 01 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,977 | $0 | Not Implemented |
WI0257 # 02 Y:1996 | 02 | 1996 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $5,468 | $15,000 | Not Implemented |
WI0257 # 03 Y:1996 | 03 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,982 | $7,000 | Not Implemented |
WI0257 # 04 Y:1996 | 04 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,323 | $3,075 | Not Implemented |
WI0257 # 05 Y:1996 | 05 | 1996 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,246 | $0 | Not Implemented |
WI0260 # 01 Y:1996 | 01 | 1996 | INSTALL SET-BACK TIMERS | $15,994 | $1,600 | Not Implemented |
WI0260 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,781 | $2,212 | Implemented |
WI0260 # 03 Y:1996 | 03 | 1996 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,600 | $1,000 | Not Implemented |
WI0260 # 04 Y:1996 | 04 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,542 | $1,400 | Implemented |
WI0260 # 05 Y:1996 | 05 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $820 | $1,280 | Not Implemented |
WI0260 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $755 | $210 | Implemented |
WI0260 # 07 Y:1996 | 07 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $718 | $0 | Not Implemented |
WI0253 # 01 Y:1995 | 01 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,770 | $0 | n/a |
WI0253 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,306 | $7,683 | n/a |
WI0253 # 03 Y:1995 | 03 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,174 | $0 | n/a |
WI0253 # 04 Y:1995 | 04 | 1995 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,365 | $7,000 | n/a |
WI0253 # 05 Y:1995 | 05 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,029 | $2,000 | n/a |
WI0253 # 06 Y:1995 | 06 | 1995 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,958 | $0 | n/a |