IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

293

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0276 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $1,380 Not Implemented
WI0276 # 06 Y:1996 06 1996 INSULATE BARE EQUIPMENT $1,122 $2,310 Not Implemented
WI0276 # 05 Y:1996 05 1996 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,230 $0 Not Implemented
WI0276 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,022 $2,144 Not Implemented
WI0276 # 03 Y:1996 03 1996 TURN OFF EQUIPMENT WHEN NOT IN USE $2,454 $0 Not Implemented
WI0276 # 02 Y:1996 02 1996 REPLACE CLOTH RAGS WITH PAPER TOWELS $3,400 $0 Implemented
WI0276 # 01 Y:1996 01 1996 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $4,740 $15,000 Not Implemented
WI0275 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $588 $450 Not Implemented
WI0275 # 01 Y:1996 01 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,083 $1,400 Not Implemented
WI0275 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,633 $14,000 Not Implemented
WI0275 # 03 Y:1996 03 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,271 $3,200 Not Implemented
WI0275 # 05 Y:1996 05 1996 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,984 $0 Not Implemented
WI0275 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $1,013 $600 Implemented
WI0275 # 08 Y:1996 08 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $591 Not Implemented
WI0275 # 09 Y:1996 09 1996 USE AUTOMATIC FLOW CONTROL $676 $200 Implemented
WI0275 # 10 Y:1996 10 1996 INSTALL TIMERS AND/OR THERMOSTATS $653 $200 Implemented
WI0275 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $3,184 Not Implemented
WI0274 # 04 Y:1996 04 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,686 $0 Not Implemented
WI0274 # 01 Y:1996 01 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $8,100 $0 Not Implemented
WI0274 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,613 $1,400 Not Implemented
WI0274 # 03 Y:1996 03 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $3,082 $10,500 Implemented
WI0274 # 07 Y:1996 07 1996 INSTALL OCCUPANCY SENSORS $369 $900 Not Implemented
WI0274 # 05 Y:1996 05 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $905 $700 Implemented
WI0274 # 08 Y:1996 08 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $331 $640 Implemented
WI0274 # 06 Y:1996 06 1996 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $748 $1,000 Implemented