IAC Assessment: WI0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1996
Principal Product Injection molded plastic products
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 65,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $219,489 2,810,961 kWh $0.08
Electricity Demand $86,659 7,166 kW-months/year $12.09
Electricity Fees $1,040 - $ -
Natural Gas $18,508 5,438 MMBtu $3.40
TOTAL ENERGY COSTS $325,696
RECOMMENDED SAVINGS* $20,995 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,342
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,083
Cost:
$1,400
$4,016 90,563 $3,378 266 $(-1,311) (-386) - - $4,016
90,563
kWh
$3,378
266
kW-months/year
$(-1,311)
(-386)
MMBtu
-
-
Tgal
02: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE Savings:
$4,633
Cost:
$14,000
$3,261 73,564 $1,372 108 - - - - $3,261
73,564
kWh
$1,372
108
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,271
Cost:
$3,200
- - - - $3,271 997 - - -
-
kWh
-
-
kW-months/year
$3,271
997
MMBtu
-
-
Tgal
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$588
Cost:
$450
- - - - $588 173 - - -
-
kWh
-
-
kW-months/year
$588
173
MMBtu
-
-
Tgal
05: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$1,984
Cost:
-
- - $1,984 168 - - - - -
-
kWh
$1,984
168
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,750
Cost:
$3,184
$1,288 18,464 $462 36 - - - - $1,288
18,464
kWh
$462
36
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,013
Cost:
$600
$1,013 22,860 - - - - - - $1,013
22,860
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$344
Cost:
$591
$161 3,517 $183 14 - - - - $161
3,517
kWh
$183
14
kW-months/year
-
-
MMBtu
-
-
Tgal
09: 3.1194 USE AUTOMATIC FLOW CONTROL Savings:
$676
Cost:
$200
- - - - - - $676 173,280 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$676
173,280
Tgal
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$653
Cost:
$200
- - - - $653 192 - - -
-
kWh
-
-
kW-months/year
$653
192
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$20,995
Cost:
$23,825
$9,739 208,968 $7,379 592 $3,201 976 $676 173,280 $9,739
208,968
kWh
$7,379
592
kW-months/year
$3,201
976
MMBtu
$676
173,280
Tgal
TOTAL IMPLEMENTED Savings:
$2,342
Cost:
$1,000
$1,013 22,860 - - $653 192 $676 173,280 $1,013
22,860
kWh
-
-
kW-months/year
$653
192
MMBtu
$676
173,280
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal