IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0257 # 01 Y:1996 01 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,977 $0 Not Implemented
WI0257 # 02 Y:1996 02 1996 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $5,468 $15,000 Not Implemented
WI0257 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,982 $7,000 Not Implemented
WI0257 # 04 Y:1996 04 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,323 $3,075 Not Implemented
WI0257 # 05 Y:1996 05 1996 INSTALL SPECTRAL REFLECTORS / DELAMP $1,246 $0 Not Implemented
WI0262 # 01 Y:1996 01 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,545 $0 Implemented
WI0262 # 02 Y:1996 02 1996 INSTALL SET-BACK TIMERS $11,567 $2,400 Not Implemented
WI0262 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,821 $0 Implemented
WI0262 # 04 Y:1996 04 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,280 $0 Implemented
WI0262 # 05 Y:1996 05 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $828 $0 Not Implemented
WI0262 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $437 $700 Not Implemented
WI0262 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $270 $0 Not Implemented
WI0256 # 01 Y:1996 01 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $27,900 $4,000 Not Implemented
WI0256 # 02 Y:1996 02 1996 INSTALL SET-BACK TIMERS $26,926 $1,100 Not Implemented
WI0256 # 03 Y:1996 03 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,375 $0 Implemented
WI0256 # 04 Y:1996 04 1996 MINIMIZE WATER USAGE $1,975 $0 Implemented
WI0256 # 05 Y:1996 05 1996 USE OPTIMUM THICKNESS INSULATION $1,431 $2,160 Not Implemented
WI0256 # 06 Y:1996 06 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,370 $5,000 Not Implemented
WI0256 # 07 Y:1996 07 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $596 $700 Not Implemented
WI0256 # 08 Y:1996 08 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $569 $0 Not Implemented
WI0256 # 09 Y:1996 09 1996 INSTALL OCCUPANCY SENSORS $370 $675 Not Implemented
WI0256 # 10 Y:1996 10 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $335 $0 Implemented
WI0256 # 11 Y:1996 11 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $273 $500 Implemented
WI0261 # 01 Y:1996 01 1996 REDUCE VENTILATION AIR $4,065 $1,000 Not Implemented
WI0261 # 02 Y:1996 02 1996 INSTALL SET-BACK TIMERS $4,026 $1,200 Implemented