IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,298

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0261 # 03 Y:1996 03 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,491 $0 Implemented
WI0261 # 04 Y:1996 04 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,300 $5,000 Not Implemented
WI0261 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $113 $0 Implemented
WI0261 # 06 Y:1996 06 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $106 $56 Not Implemented
WI0260 # 01 Y:1996 01 1996 INSTALL SET-BACK TIMERS $15,994 $1,600 Not Implemented
WI0260 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,781 $2,212 Implemented
WI0260 # 03 Y:1996 03 1996 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,600 $1,000 Not Implemented
WI0260 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,542 $1,400 Implemented
WI0260 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $820 $1,280 Not Implemented
WI0260 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $755 $210 Implemented
WI0260 # 07 Y:1996 07 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $718 $0 Not Implemented
WI0259 # 01 Y:1996 01 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $24,500 $25,000 Not Implemented
WI0259 # 02 Y:1996 02 1996 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $19,300 $35,025 Implemented
WI0259 # 03 Y:1996 03 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $13,875 $5,000 Not Implemented
WI0259 # 04 Y:1996 04 1996 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,744 $0 Implemented
WI0259 # 05 Y:1996 05 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,392 $960 Not Implemented
WI0259 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,107 $4,300 Implemented
WI0259 # 07 Y:1996 07 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,936 $492 Not Implemented
WI0259 # 08 Y:1996 08 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $925 $1,000 Not Implemented
WI0259 # 09 Y:1996 09 1996 REDUCE VENTILATION AIR $861 $1,000 Implemented
WI0259 # 10 Y:1996 10 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $330 $0 Not Implemented
WI0253 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $6,770 $0 n/a
WI0253 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,306 $7,683 n/a
WI0253 # 03 Y:1995 03 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,174 $0 n/a
WI0253 # 04 Y:1995 04 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,365 $7,000 n/a