Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
293
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0285 # 01 Y:1996 | 01 | 1996 | REDUCE VENTILATION AIR | $210,013 | $64,100 | Not Implemented |
WI0285 # 06 Y:1996 | 06 | 1996 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $2,549 | $10,500 | Not Implemented |
WI0285 # 05 Y:1996 | 05 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,605 | $8,500 | Not Implemented |
WI0285 # 08 Y:1996 | 08 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $2,521 | Not Implemented |
WI0285 # 09 Y:1996 | 09 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,100 | $0 | Not Implemented |
WI0285 # 10 Y:1996 | 10 | 1996 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $380 | $500 | Not Implemented |
WI0285 # 04 Y:1996 | 04 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,042 | $3,100 | Not Implemented |
WI0285 # 02 Y:1996 | 02 | 1996 | INCREASE USE OF AUTOMATION | $60,000 | $140,000 | Not Implemented |
WI0285 # 03 Y:1996 | 03 | 1996 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,786 | $0 | Implemented |
WI0285 # 07 Y:1996 | 07 | 1996 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,680 | $1,216 | Not Implemented |
WI0279 # 01 Y:1996 | 01 | 1996 | INSTALL TIMERS AND/OR THERMOSTATS | $18,544 | $3,400 | Not Implemented |
WI0279 # 09 Y:1996 | 09 | 1996 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,700 | $0 | Not Implemented |
WI0279 # 11 Y:1996 | 11 | 1996 | REDUCE VENTILATION AIR | $351 | $500 | Implemented |
WI0279 # 10 Y:1996 | 10 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,744 | $15,000 | Not Implemented |
WI0279 # 02 Y:1996 | 02 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $12,559 | $30,000 | Not Implemented |
WI0279 # 06 Y:1996 | 06 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,075 | $0 | Implemented |
WI0279 # 05 Y:1996 | 05 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,439 | $1,000 | Not Implemented |
WI0279 # 03 Y:1996 | 03 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,523 | $0 | Not Implemented |
WI0279 # 07 Y:1996 | 07 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,216 | $1,779 | Implemented |
WI0279 # 04 Y:1996 | 04 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,862 | $27,740 | Implemented |
WI0279 # 08 Y:1996 | 08 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,917 | $9,000 | Not Implemented |
WI0284 # 09 Y:1996 | 09 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $585 | $237 | Not Implemented |
WI0284 # 01 Y:1996 | 01 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,453 | $0 | Not Implemented |
WI0284 # 06 Y:1996 | 06 | 1996 | MINIMIZE WATER USAGE | $2,210 | $1,000 | Implemented |
WI0284 # 10 Y:1996 | 10 | 1996 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,061 | $1,000 | Implemented |