IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

135

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0093 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,192 $2,750 Not Implemented
WM0093 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $593 $1,400 Not Implemented
WM0088 # 01 Y:2016 01 2016 OPTIMIZE PLANT POWER FACTOR $71,275 $132,797 Not Implemented
WM0088 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $75,376 $50,000 Not Implemented
WM0088 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,940 $28,000 Not Implemented
WM0088 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,075 $501 Not Implemented
WM0088 # 05 Y:2016 05 2016 METER WASTE WATER $4,267 $375 Not Implemented
WM0088 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,245 $0 Implemented
WM0088 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,531 $6,000 Not Implemented
WM0066 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,059 $84,720 Not Implemented
WM0066 # 02 Y:2015 02 2015 USE RADIANT HEATER FOR SPOT HEATING $1,804 $1,526 Not Implemented
WM0066 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $503 $0 Implemented
WM0066 # 04 Y:2015 04 2015 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,258 $5,000 Not Implemented
WM0066 # 05 Y:2015 05 2015 USE SYNTHETIC LUBRICANT $1,255 $1,348 Not Implemented
WM0066 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $513 $550 Not Implemented
WM0066 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $0 Not Implemented
WM0066 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $401 $55 Not Implemented
WM0066 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $392 $84 Implemented
WM0066 # 10 Y:2015 10 2015 USE PHOTOCELL CONTROLS $371 $600 Not Implemented
WM0066 # 11 Y:2015 11 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $282 $70 Implemented
WM0066 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $491 $75 Implemented
WM0066 # 13 Y:2015 13 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $195 $56 Not Implemented
WM0066 # 14 Y:2015 14 2015 METER WASTE WATER $144 $375 Not Implemented
WM0060 # 01 Y:2015 01 2015 REPLACE BOILER $24,302 $20,000 Not Implemented
WM0060 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,761 $2,291 Implemented