IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,331

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0669 # 12 Y:2024 12 2024 DEVELOP A REPAIR/REPLACE POLICY $1,463 $1,143 Implemented
WV0669 # 01 Y:2024 01 2024 REPAIR OR REPLACE STEAM TRAPS $19,270 $9,950 Implemented
WV0669 # 17 Y:2024 17 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $135 $363 Implemented
WV0669 # 14 Y:2024 14 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $843 $1,200 Implemented
WV0669 # 16 Y:2024 16 2024 INSULATE BARE EQUIPMENT $357 $798 Implemented
WV0669 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,467 $940 Implemented
WV0669 # 08 Y:2024 08 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,886 $1,088 Implemented
WV0669 # 03 Y:2024 03 2024 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,442 $5,225 Implemented
WV0669 # 13 Y:2024 13 2024 OPTIMIZE PLANT POWER FACTOR $1,227 $5,535 Implemented
WV0662 # 05 Y:2024 05 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,538 $6,417 Implemented
WV0662 # 11 Y:2024 11 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $428 $945 Implemented
WV0662 # 07 Y:2024 07 2024 DEVELOP A REPAIR/REPLACE POLICY $3,117 $2,250 Implemented
WV0662 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,247 $750 Implemented
WV0662 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,172 $700 Implemented
WV0662 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $8,386 $5,500 Implemented
WV0662 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $2,490 $392 Implemented
WV0662 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,601 $10,521 Implemented
WV0653 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,961 $800 Implemented
WV0653 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $38,158 $64,250 Implemented
WV0653 # 13 Y:2023 13 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,757 $1,288 Implemented
WV0653 # 14 Y:2023 14 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,320 $1,500 Implemented
WV0653 # 06 Y:2023 06 2023 MINIMIZE WATER USAGE $13,630 $45,516 Implemented
WV0653 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $1,621 $787 Implemented
WV0653 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $10,683 $9,567 Implemented
WV0653 # 15 Y:2023 15 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,200 $3,036 Implemented