Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
107
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0349 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $200 | Implemented |
WV0349 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $1,998 | $512 | Implemented |
WV0349 # 10 Y:2006 | 10 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,456 | $10,700 | Not Implemented |
WV0349 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $3,740 | $1,318 | Implemented |
WV0349 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,291 | $1,000 | Implemented |
WV0349 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,242 | $400 | Implemented |
WV0349 # 06 Y:2006 | 06 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,322 | $3,250 | Not Implemented |
WV0349 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,522 | $600 | Not Implemented |
WV0349 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $13,672 | $10,295 | Implemented |
WV0349 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,527 | $640 | Implemented |
WV0349 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $48,286 | $39,350 | Implemented |
WV0349 # 01 Y:2006 | 01 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $167,255 | $32,010 | Not Implemented |
WV0348 # 03 Y:2006 | 03 | 2006 | REDUCE VENTILATION AIR | $10,762 | $18,600 | Not Implemented |
WV0348 # 01 Y:2006 | 01 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $22,813 | $25,350 | Implemented |
WV0348 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $14,538 | $3,000 | Implemented |
WV0348 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,642 | $8,678 | Implemented |
WV0348 # 05 Y:2006 | 05 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,373 | $13,940 | Not Implemented |
WV0348 # 06 Y:2006 | 06 | 2006 | REDUCE VENTILATION AIR | $4,100 | $6,800 | Not Implemented |
WV0348 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,260 | $0 | Implemented |
WV0348 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,808 | $1,000 | Implemented |
WV0348 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,346 | $2,540 | Not Implemented |
WV0348 # 17 Y:2006 | 17 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $528 | $880 | Not Implemented |
WV0348 # 16 Y:2006 | 16 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $545 | $266 | Implemented |
WV0348 # 15 Y:2006 | 15 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $866 | $680 | Implemented |
WV0348 # 10 Y:2006 | 10 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,322 | $560 | Implemented |