Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
294
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0205 # 06 Y:2000 | 06 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $7,688 | $7,933 | Implemented |
WV0205 # 09 Y:2000 | 09 | 2000 | USE OPTIMUM THICKNESS INSULATION | $171 | $375 | Implemented |
WV0205 # 07 Y:2000 | 07 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,511 | $600 | Not Implemented |
WV0205 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $347 | $519 | Implemented |
WV0205 # 14 Y:2000 | 14 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $77,688 | $750 | Not Implemented |
WV0205 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $394 | $50 | Implemented |
WV0205 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,709 | $800 | Not Implemented |
WV0205 # 11 Y:2000 | 11 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $480 | $100 | Implemented |
WV0205 # 12 Y:2000 | 12 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $80 | $0 | Implemented |
WV0205 # 13 Y:2000 | 13 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,182 | $7,000 | Not Implemented |
WV0205 # 04 Y:2000 | 04 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,568 | $3,000 | Implemented |
WV0205 # 01 Y:2000 | 01 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,419 | $800 | Not Implemented |
WV0205 # 15 Y:2000 | 15 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $35,000 | $5,000 | Not Implemented |
WV0205 # 08 Y:2000 | 08 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,109 | $1,500 | Not Implemented |
WV0205 # 10 Y:2000 | 10 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $9,414 | $1,000 | Implemented |
WV0204 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,706 | $268 | Not Implemented |
WV0204 # 05 Y:2000 | 05 | 2000 | INSULATE BARE EQUIPMENT | $12,395 | $2,180 | Implemented |
WV0204 # 06 Y:2000 | 06 | 2000 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,627 | $680 | Implemented |
WV0204 # 14 Y:2000 | 14 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $20,000 | $500 | Not Implemented |
WV0204 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,902 | $5,604 | Not Implemented |
WV0204 # 15 Y:2000 | 15 | 2000 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $72,800 | $140,000 | Not Implemented |
WV0204 # 04 Y:2000 | 04 | 2000 | INSTALL SPECTRAL REFLECTORS / DELAMP | $658 | $1,088 | Implemented |
WV0204 # 11 Y:2000 | 11 | 2000 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,992 | $34 | Not Implemented |
WV0204 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $705 | $75 | Implemented |
WV0204 # 09 Y:2000 | 09 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,607 | $680 | Implemented |