IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,265

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0448 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,600 $0 Implemented
AM0448 # 10 Y:2003 10 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $13,780 $0 Implemented
TA0067 # 01 Y:2003 01 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,270 $-19,270 Implemented
TA0067 # 04 Y:2003 04 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $7,485 $480 Implemented
TA0067 # 05 Y:2003 05 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,185 $485 Implemented
TA0067 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $4,240 $0 Implemented
TA0067 # 08 Y:2003 08 2003 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $3,960 $2,510 Implemented
TA0067 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,910 $0 Implemented
TA0067 # 10 Y:2003 10 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,940 $200 Implemented
TA0066 # 01 Y:2003 01 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $29,101 $28,080 Implemented
TA0066 # 02 Y:2003 02 2003 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $2,218 $0 Implemented
TA0066 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,854 $0 Implemented
TA0066 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $893 $0 Implemented
TA0066 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $668 $0 Implemented
TA0065 # 01 Y:2003 01 2003 REDESIGN PROCESS $75,086 $0 Implemented
TA0065 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $64,800 $5,200 Implemented
TA0065 # 05 Y:2003 05 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,900 $0 Implemented
TA0065 # 06 Y:2003 06 2003 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,426 $6,000 Implemented
TA0065 # 07 Y:2003 07 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,793 $0 Implemented
TA0065 # 08 Y:2003 08 2003 MOVE BOILER TO MORE EFFICIENT LOCATION $1,422 $1,894 Implemented
TA0065 # 09 Y:2003 09 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $306 $140 Implemented
TA0064 # 01 Y:2003 01 2003 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,350 $1,800 Implemented
TA0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,770 $0 Implemented
TA0064 # 05 Y:2003 05 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,740 $520 Implemented
TA0064 # 07 Y:2003 07 2003 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $101 $211 Implemented