Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,681
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0584 # 10 Y:2022 | 10 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $68,493 | $0 | Implemented |
UF0583 # 01 Y:2022 | 01 | 2022 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,276 | $1,243,750 | Implemented |
UF0583 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $44,987 | $62,001 | Implemented |
UF0583 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,746 | $33,000 | Implemented |
UF0583 # 04 Y:2022 | 04 | 2022 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,240 | $0 | Implemented |
MI0410 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $10,695 | Implemented |
MI0410 # 01 Y:2022 | 01 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $11,438 | $580 | Implemented |
MI0410 # 02 Y:2022 | 02 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,151 | $7,280 | Implemented |
MI0410 # 05 Y:2022 | 05 | 2022 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,575 | $597 | Implemented |
MI0410 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,493 | $140 | Implemented |
MI0409 # 03 Y:2022 | 03 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,003 | $14,690 | Implemented |
MI0409 # 05 Y:2022 | 05 | 2022 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,094 | $1,885 | Implemented |
MI0409 # 06 Y:2022 | 06 | 2022 | INSTALL OCCUPANCY SENSORS | $235 | $700 | Implemented |
MI0409 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $222 | $363 | Implemented |
UF0582 # 04 Y:2022 | 04 | 2022 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $226,296 | $102,253 | Implemented |
UF0582 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,793 | $79,204 | Implemented |
UF0582 # 08 Y:2022 | 08 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,408 | $756 | Implemented |
UF0582 # 10 Y:2022 | 10 | 2022 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $16,853 | $7,275 | Implemented |
UF0582 # 12 Y:2022 | 12 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $333,010 | $0 | Implemented |
MI0408 # 01 Y:2022 | 01 | 2022 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $21,620 | $960 | Implemented |
MI0408 # 02 Y:2022 | 02 | 2022 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $5,828 | $2,327 | Implemented |
MI0408 # 03 Y:2022 | 03 | 2022 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,767 | $580 | Implemented |
MI0408 # 04 Y:2022 | 04 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,972 | $120 | Implemented |
MI0408 # 06 Y:2022 | 06 | 2022 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $644 | $570 | Implemented |
MI0407 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,140 | $7,899 | Implemented |