Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2023
Principal Product Extruded Vinyl Rubber
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 91,000
Annual Production 23,601,102 Pounds
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $180,107 2,733,320 kWh $0.07
Electricity Demand $28,365 6,856 kW-months/year $4.14
Electricity Fees $43,186 - $ -
Natural Gas $539 8 MMBtu $66.54
LPG $4,538 167 MMBtu $27.17
TOTAL ENERGY COSTS $256,735
RECOMMENDED SAVINGS* $144,650 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $144,650
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$20,876
Cost:
$14,705
$18,040 273,332 $2,836 686 - - $18,040
273,332
kWh
$2,836
686
kW-months/year
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,736
Cost:
$15,722
$8,283 125,502 $3,453 835 - - $8,283
125,502
kWh
$3,453
835
kW-months/year
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$9,612
Cost:
$25,370
$9,612 145,643 - - - - $9,612
145,643
kWh
-
-
kW-months/year
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$6,142
Cost:
$22,000
$4,764 72,176 $1,378 333 - - $4,764
72,176
kWh
$1,378
333
kW-months/year
-
-
$
05: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$3,959
Cost:
$11,134
$3,959 59,990 - - - - $3,959
59,990
kWh
-
-
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,382
Cost:
$13,706
$2,874 43,547 $508 123 - - $2,874
43,547
kWh
$508
123
kW-months/year
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,699
Cost:
$4,994
$1,699 25,745 - - - - $1,699
25,745
kWh
-
-
kW-months/year
-
-
$
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$51,744
Cost:
$18,218
- - - - $51,744 - -
-
kWh
-
-
kW-months/year
$51,744
-
$
09: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$35,500
Cost:
$4,261
$(-4,337) (-65,707) $(-523) (-126) $40,360 - $(-4,337)
(-65,707)
kWh
$(-523)
(-126)
kW-months/year
$40,360
-
$
TOTAL RECOMMENDED Savings:
$144,650
Cost:
$130,110
$44,894 680,228 $7,652 1,850 $92,104 - $44,894
680,228
kWh
$7,652
1,850
kW-months/year
$92,104
-
$
TOTAL IMPLEMENTED Savings:
$144,650
Cost:
$130,110
$44,894 680,228 $7,652 1,850 $92,104 - $44,894
680,228
kWh
$7,652
1,850
kW-months/year
$92,104
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes