IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0307 # 03 Y:1994 03 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,970 $886 Implemented
MA0307 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $648 Implemented
MA0307 # 05 Y:1994 05 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $906 $3,063 Implemented
MA0307 # 07 Y:1994 07 1994 REUSE / RECYCLE/ SELL PAPER PRODUCTS $666 $540 Implemented
MA0294 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $91 Implemented
MA0294 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Implemented
MA0292 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,154 $0 Implemented
MA0292 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,012 $1,062 Implemented
MA0292 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $939 $100 Implemented
MA0292 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $503 $300 Implemented
MA0292 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $327 $961 Implemented
MA0264 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,121 $9,386 Implemented
MA0264 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $3,896 $1,274 Implemented
MA0264 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,443 $1,176 Implemented
MA0264 # 04 Y:1993 04 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,451 $1,500 Implemented
MA0235 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,525 $24,600 Implemented
MA0235 # 04 Y:1992 04 1992 REPAIR AND ELIMINATE STEAM LEAKS $7,975 $165 Implemented
MA0232 # 03 Y:1992 03 1992 REPAIR OR REPLACE STEAM TRAPS $2,293 $2 Implemented
MA0232 # 04 Y:1992 04 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $5,067 $0 Implemented
MA0232 # 05 Y:1992 05 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $884 $150 Implemented
MA0234 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,700 $153,525 Implemented
MA0234 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,505 $24,600 Implemented
MA0234 # 04 Y:1992 04 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $9,100 $3,720 Implemented
MA0225 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $1,367 $660 Implemented
MA0225 # 05 Y:1991 05 1991 REPAIR OR REPLACE STEAM TRAPS $970 $970 Implemented