Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,628
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0376 # 03 Y:1992 | 03 | 1992 | INSTALL SET-BACK TIMERS | $556 | $0 | Implemented |
UD0373 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $6,664 | $8,600 | Implemented |
UD0373 # 02 Y:1992 | 02 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,724 | $0 | Implemented |
UD0373 # 04 Y:1992 | 04 | 1992 | METER WASTE WATER | $14,996 | $300,000 | Implemented |
UD0370 # 02 Y:1992 | 02 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,993 | $500 | Implemented |
UD0370 # 04 Y:1992 | 04 | 1992 | INSTALL SET-BACK TIMERS | $767 | $500 | Implemented |
UD0371 # 01 Y:1992 | 01 | 1992 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,032 | $300 | Implemented |
UD0371 # 02 Y:1992 | 02 | 1992 | INSTALL SET-BACK TIMERS | $473 | $0 | Implemented |
UD0371 # 04 Y:1992 | 04 | 1992 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,388 | $45,000 | Implemented |
UD0372 # 01 Y:1992 | 01 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,610 | $0 | Implemented |
UD0372 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $305 | $6,008 | Implemented |
UD0366 # 01 Y:1992 | 01 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,200 | $0 | Implemented |
UD0366 # 02 Y:1992 | 02 | 1992 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $582 | $500 | Implemented |
UD0366 # 03 Y:1992 | 03 | 1992 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,078 | $0 | Implemented |
UD0366 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,144 | $532 | Implemented |
UD0368 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $9,369 | $6,350 | Implemented |
UD0368 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,359 | $2,772 | Implemented |
UD0369 # 02 Y:1992 | 02 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,020 | $0 | Implemented |
UD0369 # 03 Y:1992 | 03 | 1992 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,504 | $0 | Implemented |
UD0369 # 04 Y:1992 | 04 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $850 | $0 | Implemented |
UD0369 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,413 | $300 | Implemented |
UD0369 # 07 Y:1992 | 07 | 1992 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,842 | $1,800 | Implemented |
ND0019 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,082 | $1,170 | Implemented |
ND0019 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,160 | $200 | Implemented |
ND0019 # 04 Y:1992 | 04 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $384 | $400 | Implemented |