IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,265

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0171 # 01 Y:1993 01 1993 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $11,850 $820 Implemented
AM0171 # 03 Y:1993 03 1993 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $22,300 $54,800 Implemented
AM0171 # 06 Y:1993 06 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $0 Implemented
AM0171 # 08 Y:1993 08 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,690 $4,630 Implemented
AM0171 # 09 Y:1993 09 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $520 $0 Implemented
AM0168 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $420 Implemented
AM0168 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $990 $2,140 Implemented
AM0168 # 08 Y:1993 08 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $530 $153 Implemented
AM0169 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $0 Implemented
AM0169 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $810 $2,000 Implemented
AM0166 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $59,900 $29,000 Implemented
AM0166 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,500 $500 Implemented
AM0166 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $500 $75 Implemented
AM0167 # 01 Y:1993 01 1993 SHUT OFF PILOTS IN STANDBY EQUIPMENT $28,100 $0 Implemented
AM0167 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $10,100 $16,000 Implemented
AM0167 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,720 $4,400 Implemented
AM0167 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,610 $4,900 Implemented
AM0165 # 01 Y:1992 01 1992 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $23,570 $1,350 Implemented
AM0165 # 02 Y:1992 02 1992 LOWER CEILING TO REDUCE CONDITIONED SPACE $6,300 $3,630 Implemented
AM0165 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,330 $2,520 Implemented
AM0165 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $150 $190 Implemented
AM0163 # 01 Y:1992 01 1992 OPTIMIZE PLANT POWER FACTOR $18,300 $35,000 Implemented
AM0163 # 02 Y:1992 02 1992 REPAIR AND ELIMINATE STEAM LEAKS $2,440 $1,240 Implemented
AM0163 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $330 $0 Implemented
AM0164 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $93,089 $0 Implemented