IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,265

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0118 # 09 Y:1991 09 1991 RECOVER WASTE HEAT FROM EQUIPMENT $580 $200 Implemented
AM0119 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $148 Implemented
AM0119 # 02 Y:1991 02 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $420 $0 Implemented
AM0119 # 03 Y:1991 03 1991 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $250 $260 Implemented
AM0119 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $103 $320 Implemented
AM0111 # 01 Y:1991 01 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,760 $0 Implemented
AM0111 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $6,300 $7,100 Implemented
AM0111 # 03 Y:1991 03 1991 OPTIMIZE PLANT POWER FACTOR $3,530 $5,700 Implemented
AM0111 # 04 Y:1991 04 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,130 $5,540 Implemented
AM0111 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $1,820 $4,800 Implemented
AM0111 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $34 Implemented
AM0113 # 01 Y:1991 01 1991 USE UTILITY CONTROLLED POWER MANAGEMENT $687,000 $250,000 Implemented
AM0113 # 02 Y:1991 02 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $34,390 $88,900 Implemented
AM0113 # 03 Y:1991 03 1991 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,300 $280 Implemented
AM0113 # 04 Y:1991 04 1991 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $2,815 $400 Implemented
AM0113 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $340 $290 Implemented
AM0107 # 01 Y:1991 01 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $12,100 $0 Implemented
AM0107 # 02 Y:1991 02 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,000 $400 Implemented
AM0107 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $438 $2,272 Implemented
AM0107 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,730 $2,400 Implemented
AM0107 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $750 $260 Implemented
AM0107 # 06 Y:1991 06 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $650 $0 Implemented
AM0107 # 07 Y:1991 07 1991 INSTALL TIMERS AND/OR THERMOSTATS $405 $130 Implemented
AM0108 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,366 $0 Implemented
AM0108 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,700 $12,000 Implemented