Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75,351
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0565 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,336 | $0 | Implemented |
SU0564 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,420 | $332 | Implemented |
SU0564 # 01 Y:2024 | 01 | 2024 | DISCONNECT BALLASTS | $103 | $0 | Implemented |
SU0564 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,312 | $118 | Implemented |
UD1098 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $715 | $1,235 | Implemented |
UD1098 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $513 | $0 | Implemented |
UD1098 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,612 | $306 | Implemented |
SU0564 # 02 Y:2024 | 02 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,442 | $0 | Implemented |
NT0038 # 02 Y:2025 | 02 | 2025 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,913 | $0 | Implemented |
NT0038 # 04 Y:2025 | 04 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,311 | $0 | Implemented |
UF0624 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,844 | $6,000 | Implemented |
UF0624 # 08 Y:2024 | 08 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $23,221 | $60,000 | Implemented |
NT0038 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $370 | Implemented |
LS0325 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,309 | $0 | Implemented |
UF0624 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,908 | $14,359 | Implemented |
NT0038 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,524 | $5,609 | Implemented |
UF0624 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,280 | $0 | Implemented |
LS0325 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,806 | $4,618 | Implemented |
NT0038 # 05 Y:2025 | 05 | 2025 | APPLY FOR INVESTMENT INCENTIVES | $52,835 | $5,000 | Implemented |
UF0624 # 07 Y:2024 | 07 | 2024 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $38,400 | $100,000 | Implemented |
TT0325 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,955 | $1,000 | Implemented |
TT0325 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $4,068 | $15,000 | Implemented |
TT0325 # 10 Y:2025 | 10 | 2025 | METER WASTE WATER | $1,047 | $1,100 | Implemented |
TT0325 # 02 Y:2025 | 02 | 2025 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $68,822 | $200,000 | Implemented |
LS0225 # 03 Y:2025 | 03 | 2025 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,877 | $29,510 | Implemented |