IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

831

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2408 # 08 Y:2024 08 2024 INSULATE FEEDWATER TANK $2,901 $290 Implemented
UW2408 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $116,105 $13,500 Implemented
UW2408 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,306 $2,080 Implemented
UW2408 # 01 Y:2024 01 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,069 $103,000 Implemented
UW2408 # 09 Y:2024 09 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $61,411 $421,830 Implemented
UW2408 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,014 $0 Implemented
UW2408 # 10 Y:2024 10 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,176 $144,799 Implemented
UW2408 # 05 Y:2024 05 2024 OPTIMIZE PLANT POWER FACTOR $45,697 $89,919 Implemented
UW2408 # 07 Y:2024 07 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $34,834 $133,560 Implemented
UW2408 # 06 Y:2024 06 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $35,732 $2,619 Implemented
UW2407 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $207,284 $100 Implemented
UW2407 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $69,227 $25,000 Implemented
UW2407 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $2,085 $28,384 Implemented
UW2404 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,140 $25,000 Implemented
UW2404 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $141,402 $150,381 Implemented
UW2404 # 05 Y:2024 05 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,990 $112,500 Implemented
UW2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,693 $75,000 Implemented
UW2403 # 07 Y:2024 07 2024 USE RADIANT HEATER FOR SPOT HEATING $8,794 $58,500 Implemented
UW2403 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,319 $720 Implemented
UW2403 # 06 Y:2024 06 2024 UPGRADE OBSOLETE EQUIPMENT $6,846 $30,000 Implemented
UW2403 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,147 $4,257 Implemented
UW2403 # 03 Y:2024 03 2024 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $222,893 $500,000 Implemented
UW2403 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,988 $1,080 Implemented
UW2403 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $8,480 $4,010 Implemented
UW2403 # 08 Y:2024 08 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,078 $36,400 Implemented