IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,351

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0116 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $18,871 $20,540 Implemented
AR0050 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,999 $400 Implemented
AR0050 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,361 $2,240 Implemented
AR0050 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $988 $300 Implemented
AR0050 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,207 $710 Implemented
AR0050 # 05 Y:1995 05 1995 MINIMIZE WATER USAGE $4,887 $40 Implemented
AM0242 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,440 $4,020 Implemented
AM0242 # 02 Y:1995 02 1995 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $630 $0 Implemented
AM0242 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $330 $0 Implemented
AM0242 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $100 $25 Implemented
AM0242 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $76 $100 Implemented
GT0552 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,000 $208,000 Implemented
GT0552 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,400 $0 Implemented
GT0552 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $575 $191 Implemented
GT0552 # 05 Y:1995 05 1995 REPAIR AND ELIMINATE STEAM LEAKS $4,890 $500 Implemented
OD0029 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $582 $360 Implemented
OD0029 # 06 Y:1995 06 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,463 $800 Implemented
UL0124 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $977 $1,120 Implemented
WV0059 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,147 $4,000 Implemented
WV0059 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $539 $280 Implemented
IA0110 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,304 $79,400 Implemented
IA0110 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,241 $1,577 Implemented
IA0110 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $144 $270 Implemented
KU0454 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,987 $18,760 Implemented
KU0454 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $8,681 $10,200 Implemented