Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Louisville |
---|---|
Assessment Year | 1995 |
Principal Product | Portable Water Storage Tanks |
NAICS | n/a |
SIC | 3433 - Heating Equipment, Except Electric |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 100 Pieces |
Production Hrs. Annual | 5,000 |
Location (State) | KY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $134,784 | 2,124,560 | kWh | $0.06 |
Natural Gas | $63,729 | 15,172 | MMBtu | $4.20 |
TOTAL ENERGY COSTS | $397,152 | |||
RECOMMENDED SAVINGS* | $205,653 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $977 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,714 Cost: $1,789 |
$2,714 | 42,790 | - | - | - | - | - | - | - | - |
$2,714 42,790 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,134 Cost: $43 |
$1,134 | 17,878 | - | - | - | - | - | - | - | - |
$1,134 17,878 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $848 Cost: $1,000 |
- | - | $848 | 202 | - | - | - | - | - | - |
- - kWh |
$848 202 MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $977 Cost: $1,120 |
$977 | - | - | - | - | - | - | - | - | - |
$977 - kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,406 Cost: $3,609 |
$2,406 | 37,808 | - | - | - | - | - | - | - | - |
$2,406 37,808 kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2172 USE AUTOMATIC CLEANING EQUIPMENT |
Savings: $2,033 Cost: $1,615 |
- | - | - | - | $1,528 | 501 | $505 | 372 | - | - |
- - kWh |
- - MMBtu |
$1,528 501 gal |
$505 372 lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $92,792 Cost: $17,600 |
- | - | - | - | $89,680 | 4,720 | - | - | $3,112 | 3,890 |
- - kWh |
- - MMBtu |
$89,680 4,720 gal |
- - lb |
$3,112 3,890 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.2136 USE "WASH-LESS" PROCESSING EQUIPMENT |
Savings: $99,415 Cost: $9,240 |
- | - | - | - | $96,083 | 5,057 | - | - | $3,332 | 4,165 |
- - kWh |
- - MMBtu |
$96,083 5,057 gal |
- - lb |
$3,332 4,165 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $3,333 Cost: $3,124 |
- | - | - | - | - | - | - | - | $3,333 | 4,167 |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$3,333 4,167 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $77 Cost: $75 |
- | - | - | - | - | - | $1 | 88 | $76 | 5,058 |
- - kWh |
- - MMBtu |
- - gal |
$1 88 lb |
$76 5,058 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE |
Savings: $(-76) Cost: $89 |
- | - | - | - | - | - | - | - | $(-76) | 1,293 |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$(-76) 1,293 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $205,653 Cost: $39,304 |
$7,231 | 98,476 | $848 | 202 | $187,291 | 10,278 | $506 | 460 | $9,777 | 18,573 | $7,231 98,476 kWh |
$848 202 MMBtu |
$187,291 10,278 gal |
$506 460 lb |
$9,777 18,573 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $977 Cost: $1,120 |
$977 | - | - | - | - | - | - | - | - | - | $977 - kWh |
- - MMBtu |
- - gal |
- - lb |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Solid Waste (haz) |