IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,351

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0014 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $200 $73 Implemented
MS0014 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,207 $2,085 Implemented
MS0014 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $347 $1,000 Implemented
GT0545 # 01 Y:1994 01 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $25,370 $0 Implemented
GT0545 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,800 $14,340 Implemented
GT0545 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,480 $3,780 Implemented
GT0545 # 05 Y:1994 05 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,400 $12,000 Implemented
WI0221 # 03 Y:1994 03 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,803 $0 Implemented
WI0221 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $838 $1,000 Implemented
WI0221 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $186 $640 Implemented
WI0221 # 07 Y:1994 07 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $138 $500 Implemented
AM0224 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,090 $1,000 Implemented
AM0224 # 02 Y:1994 02 1994 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $425 $0 Implemented
AM0224 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $355 $126 Implemented
AM0224 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $70 $26 Implemented
AM0225 # 01 Y:1994 01 1994 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,100 $81,000 Implemented
AM0225 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,670 $15,000 Implemented
AM0225 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,260 $0 Implemented
AM0225 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $730 $200 Implemented
AM0225 # 06 Y:1994 06 1994 USE A RAG RECYCLE SERVICE $1,440 $7,900 Implemented
AM0225 # 07 Y:1994 07 1994 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $290 $0 Implemented
AM0225 # 09 Y:1994 09 1994 MODIFY MATERIAL APPLICATION METHODS $0 $7,500 Implemented
GT0543 # 02 Y:1994 02 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $10,138 $3,400 Implemented
GT0543 # 04 Y:1994 04 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,880 $8,250 Implemented
GT0543 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,940 $5,000 Implemented