IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,346

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0012 # 07 Y:1994 07 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,836 $0 Implemented
ND0192 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,500 $3,780 Implemented
ND0192 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $280 Implemented
ND0192 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $293 Implemented
UF0095 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,948 $39,507 Implemented
UF0095 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,388 $1,750 Implemented
UF0095 # 03 Y:1994 03 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,867 $24,660 Implemented
UF0095 # 07 Y:1994 07 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $554 $794 Implemented
AM0220 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $96,105 $145,000 Implemented
AM0220 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $44,845 $120,000 Implemented
AM0220 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $37,861 $92,046 Implemented
AM0220 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,620 $3,800 Implemented
AM0220 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $12,915 $6,250 Implemented
AM0220 # 06 Y:1994 06 1994 WASH AND REUSE RAGS ON-SITE $2,070 $7,900 Implemented
AM0220 # 07 Y:1994 07 1994 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $670 $2,400 Implemented
ME0143 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,490 $250 Implemented
ME0143 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,350 $240 Implemented
ME0143 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,333 $1,768 Implemented
ME0143 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,622 $800 Implemented
ME0143 # 07 Y:1994 07 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $590 $800 Implemented
SF0038 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $843 $600 Implemented
SF0038 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,673 $4,082 Implemented
SF0038 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147 $141 Implemented
KU0443 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,623 $31,141 Implemented
KU0443 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,484 $11,400 Implemented