IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75,296

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0117 # 07 Y:1994 07 1994 USE HEAT PUMP FOR SPACE CONDITIONING $11,679 $27,500 Implemented
DS0003 # 04 Y:1994 04 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $3,195 $285 Implemented
DS0003 # 05 Y:1994 05 1994 REPAIR AND ELIMINATE STEAM LEAKS $596 $400 Implemented
DS0003 # 08 Y:1994 08 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,726 $26,660 Implemented
TN0529 # 01 Y:1994 01 1994 COVER OPEN TANKS $8,253 $100 Implemented
TN0529 # 02 Y:1994 02 1994 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,332 $0 Implemented
TN0529 # 07 Y:1994 07 1994 INSTALL SHROUDING ON MACHINES TO PREVENT SPLASHING $7,800 $344 Implemented
TN0529 # 09 Y:1994 09 1994 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) $5,574 $0 Implemented
SF0027 # 01 Y:1994 01 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $58,970 $168,500 Implemented
SF0027 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,109 $3,452 Implemented
SF0027 # 03 Y:1994 03 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,447 $900 Implemented
SF0027 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,267 $4,138 Implemented
SF0027 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,955 $2,545 Implemented
SF0027 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $575 $135 Implemented
SF0027 # 10 Y:1994 10 1994 USE SYNTHETIC LUBRICANT $297 $0 Implemented
MA0304 # 01 Y:1994 01 1994 USE SYNTHETIC LUBRICANT $30,227 $8,568 Implemented
MA0304 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,969 $30,800 Implemented
MA0304 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,749 $0 Implemented
MA0304 # 04 Y:1994 04 1994 SHADE WINDOWS FROM SUMMER SUN $1,847 $5,000 Implemented
SD0084 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,982 $19,450 Implemented
SD0084 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $250 Implemented
SD0084 # 04 Y:1994 04 1994 INSULATE BARE EQUIPMENT $288 $1,350 Implemented
SD0084 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $454 $933 Implemented
BD0004 # 01 Y:1994 01 1994 USE POWER DURING OFF-PEAK PERIODS $3,162 $1,000 Implemented
BD0004 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,364 $10,034 Implemented