IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,600

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0020 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,833 $551 Implemented
IA0020 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $452 $8,900 Implemented
IA0021 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,929 $353 Implemented
IA0021 # 08 Y:1992 08 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $330 $4,910 Implemented
KU0372 # 06 Y:1992 06 1992 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $32,127 $90,000 Implemented
KU0372 # 07 Y:1992 07 1992 REPAIR OR REPLACE STEAM TRAPS $29,914 $0 Implemented
KU0372 # 08 Y:1992 08 1992 REPAIR AND ELIMINATE STEAM LEAKS $5,325 $670 Implemented
KU0372 # 09 Y:1992 09 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,789 $10,400 Implemented
KU0372 # 13 Y:1992 13 1992 INSULATE BARE EQUIPMENT $3,082 $10,685 Implemented
KU0373 # 05 Y:1992 05 1992 RECOVER WASTE HEAT FROM EQUIPMENT $331 $101 Implemented
KU0373 # 07 Y:1992 07 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $271 $180 Implemented
KU0374 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $2,477 $0 Implemented
KU0374 # 04 Y:1992 04 1992 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,651 $1,785 Implemented
KU0374 # 05 Y:1992 05 1992 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $602 $1,066 Implemented
AM0156 # 02 Y:1992 02 1992 OPTIMIZE PLANT POWER FACTOR $10,125 $1,500 Implemented
AM0156 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,117 $3,200 Implemented
AM0156 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,040 $860 Implemented
AM0156 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $2,900 $0 Implemented
AS0058 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $40,257 $64,053 Implemented
AS0058 # 02 Y:1992 02 1992 USE HEAT PUMP FOR SPACE CONDITIONING $33,994 $182,325 Implemented
AS0058 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $2,531 $3,100 Implemented
AS0058 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $776 $1,400 Implemented
AS0058 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,087 $200 Implemented
AS0058 # 06 Y:1992 06 1992 REDUCE VENTILATION AIR $470 $400 Implemented
AS0058 # 07 Y:1992 07 1992 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $539 $114 Implemented