IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73,578

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0021 # 08 Y:1991 08 1991 RECOVER WASTE HEAT FROM EQUIPMENT $12,180 $1,760 Implemented
AS0021 # 09 Y:1991 09 1991 IMPROVE LUBRICATION PRACTICES $7,796 $0 Implemented
AS0021 # 10 Y:1991 10 1991 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,246 $18,000 Implemented
AS0021 # 11 Y:1991 11 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $101,612 $1,050,000 Implemented
GT0429 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $209 Implemented
GT0429 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $150 $1,130 Implemented
GT0429 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $1,600 Implemented
GT0429 # 04 Y:1991 04 1991 REDUCE GLAZED AREAS IN BUILDINGS $1,806 $10,500 Implemented
WI0110 # 01 Y:1991 01 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,416 $3,500 Implemented
WI0110 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,123 $546 Implemented
WI0110 # 03 Y:1991 03 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $282 $500 Implemented
WI0110 # 04 Y:1991 04 1991 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,840 $9,000 Implemented
WI0110 # 05 Y:1991 05 1991 INSTALL STORM WINDOWS AND DOORS $1,141 $6,311 Implemented
WI0110 # 06 Y:1991 06 1991 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,062 $2,214 Implemented
WI0110 # 07 Y:1991 07 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $346 $800 Implemented
OK0335 # 01 Y:1991 01 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,200 $0 Implemented
OK0335 # 02 Y:1991 02 1991 INSTALL TIMERS AND/OR THERMOSTATS $1,787 $1,500 Implemented
OK0335 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197 $78 Implemented
OK0335 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $162 $395 Implemented
MO0018 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,073 $542 Implemented
MO0018 # 02 Y:1991 02 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,564 $1,000 Implemented
MO0018 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $426 $757 Implemented
MO0018 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,232 $315 Implemented
MO0018 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $469 $700 Implemented
GT0427 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,000 $3,987 Implemented